Switchboard Upgrades · Parkdale

Switchboard Upgrades in Parkdale

  • Free on-site quote
  • No call-out fee on quoted work
  • 12-month workmanship warranty
  • REC 23657

Plenty of the 1950s and 60s homes between Beach Road and Lower Dandenong Road still have their first fuse board, and on the smaller blocks near the water many owners are adding a second storey rather than building out. A new level of bedrooms, bathrooms and heating puts far more load on the house than the original board was designed for. In Parkdale, the board work is often tied to a building project, and getting the order right saves time and money.

About our switchboard upgrades service

Building upwards

A second-storey addition usually needs a larger board to carry the new circuits, and the upstairs cabling has to come up through the existing house. If the building work affects the wall where the meter box sits, the meter may need relocating, which involves the distributor and a temporary supply for the builder.

Those steps take lead time and depend on the distributor's schedule, so they are best raised before the builder's program is locked in. While the ceilings downstairs are open, it is also the cheapest moment to replace any original wiring that tests poorly.

Shops with a dwelling attached

Along Como Parade, a few older shop buildings have a flat above or behind, and in some the two share a single board. A fault in the shop can cut power to the flat, and neither tenant can isolate their own circuits.

Separating them means giving each tenancy its own board and protection, and where the owner wants separate billing, arranging a second meter. The work is quoted for the landlord with each part itemised, from the new boards to the metering, and timed so the shop loses as little trading as possible.

FAQ

Common questions

I am buying a mid-century house. Will the board need replacing?

If it still has ceramic fuses and no RCDs, plan on it. A pre-purchase inspection looks at the board, earthing and visible wiring and gives you a written summary, so the cost can go into your budget before you sign.

Can the board be replaced before the builder starts?

Yes, and it often helps. A new board installed early keeps the existing house safely protected during the build and has spare positions ready for the upstairs circuits at fit-off, so there is no second changeover.