Skip to content
Zap Electrical & Data

Switchboard Upgrades · Mordialloc

Switchboard Upgrades in Mordialloc

  • Free on-site quote
  • No call-out fee on quoted work
  • 12-month workmanship warranty
  • REC 23657

Walk down almost any street off the Nepean Highway and you will pass post-war weatherboards and brick veneers that still have their original fuse panel in the meter box. Those boards date from a time when a house had a fridge, a radio and a few lights. Replacing one means new circuit breakers, RCD protection for every power and lighting circuit, and a proper test of the wiring it feeds. In Mordialloc that wiring is often as old as the board, so testing it is not a formality.

About our switchboard upgrades service

What turns up behind a post-war board

Homes built in the 1950s and 60s were commonly wired in rubber-insulated cable, and the insulation goes hard and cracks with age. When the old panel comes off, Eric tests every circuit for insulation resistance and earth continuity before connecting it to the new board.

Some circuits pass and simply move across. Others, often lighting circuits with no earth conductor, show they are near the end of their life. If that happens, you are shown the readings and given the options in writing, from replacing one circuit to a staged rewire, before any extra work is done.

If the block may be split later

Plenty of owners near the highway are weighing up whether to renovate or subdivide into townhouses. That decision changes what a new board should look like. If the house is staying for the long haul, it makes sense to size the enclosure for an induction cooktop, a heat pump and a car charger.

If demolition is a few years away, a smaller job that removes the fuses and adds RCD protection may be the sensible choice, and the money goes into the new dwellings instead. Tell us which way you are leaning at the quote and it will be priced to match.

FAQ

Common questions

Do shops on Main Street need a different kind of board?

A shop board usually carries heavier and more varied loads than a home, such as coffee machines, coolrooms and commercial dishwashers, and it may be three-phase. The work is quoted after checking the incoming supply, and any shutdown is scheduled for the hour before the doors open.

My meter box is near the beach and looks rusty. Is that part of the job?

It can be. Salt air corrodes older steel meter boxes and loosens terminals inside them. If the enclosure is too far gone to house new equipment safely, replacing it goes into the written quote as a separate line, so you can see what it adds.

Book a free on-site quote

Call EricFree quote