Skip to content
Zap Electrical & Data

Switchboard Upgrades · Cheltenham

Switchboard Upgrades in Cheltenham

  • Free on-site quote
  • No call-out fee on quoted work
  • 12-month workmanship warranty
  • REC 23657

Cheltenham has a lot of 1970s unit blocks, and their switchboards are often a small panel in a shared meter cabinet or a cupboard by the front door, with porcelain fuses and only four or five circuits. Replacing one differs from a freestanding house, because the meters, mains and cabinet partly belong to the owners corporation. Eric works out who owns what and what the space allows, then quotes a board that gives each circuit RCD protection without disturbing the neighbours' supply.

About our switchboard upgrades service

Unit blocks and shared meter cabinets

Where every unit's fuses sit together in one cabinet, there is seldom space for a modern board in the same spot. A common solution is to leave the meter and main switch in the cabinet and fit a new board inside the unit, fed by a correctly sized submain.

That needs a tidy cable route, and the owners corporation may want to approve work on common property. We supply a written scope the committee can table at a meeting, and plan the isolation so that, wherever possible, only your unit loses power.

Factory units off Bay Road and Chesterville Road

Light-industrial tenancies on the suburb's commercial side tend to have three-phase distribution boards fitted when the unit was built and extended ever since. Adding a machine, compressor or kiln can push an old board past what its busbar and main switch were rated for.

Before quoting, we check the incoming supply, the board's rating and spare ways, and whether an extra section or a full replacement makes more sense. Shutdowns are booked around production, and the job finishes with updated circuit schedules and a Certificate of Electrical Safety. Office circuits at the front are tidied up at the same time.

FAQ

Common questions

Our post-war house has its fuses in the meter box. What happens on the day?

Usually the fuses are replaced with a new enclosure in the same meter box, with breakers and RCDs for every circuit. If the meter panel is old enough to contain asbestos, we tell you how it will be removed safely and include that in the quote.

Can a new board go in before a kitchen renovation?

Yes, and it often should. Doing the board first means the new oven, cooktop and dishwasher circuits have somewhere to land, and the renovation isn't held up waiting for someone to add capacity later in the build.

Book a free on-site quote

Call EricFree quote