Skip to content
Zap Electrical & Data

Office Fit-outs · Cheltenham

Office Fit-outs in Cheltenham

  • Free on-site quote
  • No call-out fee on quoted work
  • 12-month workmanship warranty
  • REC 23657

Commercial space in Cheltenham ranges from retail tenancies around Southland to offices above the Charman Road shops and showroom units off Chesterville Road and Bay Road. Each brings different rules. A shopping centre usually has its own fit-out requirements and contractor procedures, a strip shop has an older board, and a showroom unit needs office and warehouse power planned together. At around 15 minutes from Aspendale Gardens, we can attend site meetings and each stage of the build without long gaps.

About our office fit-outs service

Tenancies around Southland and Charman Road

Tenancies in this part of the suburb often change hands with leftovers from the last occupant: cable cut off in the ceiling, lights on circuits nobody labelled and a board altered more than once. We strip out what is redundant, test what can stay and build the new layout from there.

Where a centre manager or landlord requires approved drawings, inductions or set hours for noisy work, we build that into the program from the start so access does not hold up the shopfitter. You receive test results and an updated circuit schedule at handover.

Offices attached to showrooms and units

Showroom and factory units around Bay Road often have a mezzanine or front office fitted out years ago with fluorescent troffers and a few wall outlets. Bringing it up to date usually means LED panels, power and data to each desk, a comms cabinet sized for the network and cameras, and checking whether the unit's board can carry both the office and any machinery.

If three-phase equipment is going onto the floor at the same time, we plan the two together so the board is only altered once. Old troffers and cabling are removed rather than abandoned above the ceiling.

FAQ

Common questions

Can you work to a shopping centre's contractor rules?

Yes. Send us the centre's fit-out guide and design criteria, and we will price and plan around inductions, permits, approved hours and shutdown procedures. Those requirements are listed in the quote so nothing comes as a surprise.

Do you remove old cabling when a tenancy changes hands?

Yes. Redundant power and data cable is taken out rather than left in the ceiling, existing circuits are tested before we decide what to keep, and the new board schedule reflects what is actually installed.

Book a free on-site quote

Call EricFree quote