Skip to content
Zap Electrical & Data

Switchboard Upgrades · Braeside

Switchboard Upgrades in Braeside

  • Free on-site quote
  • No call-out fee on quoted work
  • 12-month workmanship warranty
  • REC 23657

With almost no housing in the suburb, switchboard work in Braeside means the distribution boards in factories, warehouses and front offices. Many units in the Woodlands Drive estate and along Lower Dandenong Road date from the 1980s and 90s, and their boards have been extended by each tenant to suit new machinery. Eric inspects the incoming supply, the board's rating and its condition, then recommends whether to extend it, add a section or replace it outright.

About our switchboard upgrades service

Signs a factory board needs attention

Warm or discoloured breakers, a board with no spare ways, circuits labelled for machines long gone and nuisance trips when two large loads start together all point to a board that has run out of headroom. Older enclosures may also lack the internal covers expected today, leaving live parts exposed whenever the door is open.

We check terminations for heat, measure the load on each phase and give you a written assessment before any replacement is priced, so the decision rests on readings rather than guesswork. Thermal readings are kept with the report.

Planning the changeover

Replacing a distribution board means isolating everything it feeds, and on a production floor that takes careful planning. We agree the timing with you, often an early start before a shift, and prepare the new board and cabling in advance so the outage is as short as practical.

Essential loads such as refrigeration, security and IT can sometimes be kept running on a temporary supply. Every circuit is tested before it is switched back on, and the schedule on the door is rewritten to match. Spare ways are left for the next machine.

FAQ

Common questions

We're adding a CNC machine. Will the board cope?

It depends on the machine's rating, the board's busbar and main switch rating, and what is already running. We measure existing loads, check the submain and tell you whether a new circuit is enough or the board needs extending.

Do you provide paperwork for our landlord or insurer?

Yes. Once the board is in, you get an updated circuit schedule, a written summary of what changed and the safety certificate lodged for the job, all of which landlords, building managers and insurers usually ask to see.

Book a free on-site quote

Call EricFree quote