Skip to content
Zap Electrical & Data

EV Charger Installation · Brighton

EV Charger Installation in Brighton

  • Free on-site quote
  • No call-out fee on quoted work
  • 12-month workmanship warranty
  • REC 23657

Large new homes in Brighton often have two electric cars in the garage, alongside ducted heating and cooling, induction cooking and pool heating. That is a lot of load, and charging needs to be part of the supply design from the start rather than an afterthought at handover. In period homes the questions are different: old boards, limited access and a car parked in a side drive. Eric handles the planning and the installation himself.

About our ev charger installation service

Two cars, one supply

With two chargers on a busy household supply, the risk is both cars plugging in at six o'clock just as the oven, heating and pool pump are running. Load management solves this: a current sensor at the main switch tells the chargers how much headroom is left, and they share it.

Some brands link two units so they split the available current automatically. On a three-phase home we balance the chargers across phases. For new builds, this is worked out with your builder or designer at rough-in, so the board, cabling and data links are in place before walls close.

Home automation and smart controls

Architect-designed homes often run an automation or energy management system, and some owners want the charger reporting into it alongside solar, batteries and heating. Many chargers can be controlled through open protocols or the manufacturer's cloud, but compatibility varies widely, so we confirm it before ordering hardware.

At minimum, a Cat6 data run to the charger location gives a more reliable connection than garage Wi-Fi. We label the circuits, document the settings and leave the schedule set to suit your electricity plan. If a home battery is added later, the same data link helps the systems coordinate.

FAQ

Common questions

Do we need a supply upgrade for two chargers?

Not necessarily. With load management, many homes can run two chargers without upgrading the street connection. Where the expected load is high, we assess it early and handle the distributor paperwork if an upgrade is needed.

Can the charger go in before the builder finishes?

The cabling should. We run the circuit and any data cable at rough-in, leave it terminated and labelled, then mount and commission the charger once the garage is finished and the car is ready to test.

Book a free on-site quote

Call EricFree quote